Hi Can any one Share ROI ( Return on Investment Calculations ) for Technology change management intiatives , like assumptions, criteria , tracking etc., ...
ramesh aralikate
ramesh_arali...
Offline Send Email
Sep 1, 2003
1:24 pm
2750
Hi, After conducting an internal audit we publish the Audit report. In the Audit report we classify the findings as NC or Observation. Also we sub-classify the...
Ravi Soundarajan
sound_ravi
Offline Send Email
Sep 3, 2003
11:55 am
2751
Hi, We are planning to conduct a CMM Level 5 mock assessment. I need to train the Assessment Team members. If any of you have a presentation material for ...
Ravi Soundarajan
sound_ravi
Offline Send Email
Sep 5, 2003
12:16 pm
2752
CNF: ICSPI: International Conference on Software Process Anyone attend this conf in the past, I am a stakeholder in a SEPG for a large org of 300 plus dev and...
mvalderr8537
Offline Send Email
Sep 5, 2003
12:17 pm
2753
Hi all, can some one tell me when we get assessed for a level X - how long is this valid? do we need a renewal after a certain number of years. -Priya ...
Priya
srisell
Offline Send Email
Sep 5, 2003
12:17 pm
2754
Hi Ravi, we have classified the NCs into Critical, Major and Minor based on the following criteria: 1. Critical: this is a show stopper. this has to be...
sarika_shandilya
sarika_shand...
Offline Send Email
Sep 5, 2003
12:17 pm
2755
There is no provision in the model for re-assessment after a certain period. The intent is organization would be mature enough to sustain or improve the level...
Rajiv Deo
rajivdeo
Offline Send Email
Sep 7, 2003
7:48 pm
2756
Hi Priya CMM assessment conducted by KPMG / QAI in India is valid for a period of 30 months , that is waht is printed in the certificate. But this...
ramesh aralikate
ramesh_arali...
Offline Send Email
Sep 7, 2003
7:49 pm
2757
Priya, There is no official duration of validity for an assessment. The CMM says in OPF that you should conduct assessments periodically, usually every 18...
David Greer
dagreerga
Offline Send Email
Sep 7, 2003
7:49 pm
2758
Hi, Passing a CMM assessment is similar to obtaining a university degree. It is valid for ever. But when you go for outsourcing to an organization, you need to...
Roy J
roy_spi
Offline Send Email
Sep 7, 2003
7:49 pm
2759
Folks I've been working on an idea loosely based on Thermodynamics called "Project Heat" - http://www.objectmonkey.com/index.php? ...
designpatterns2003
designpatter...
Offline Send Email
Sep 7, 2003
7:49 pm
2760
Ravi, Anyone serving as an assessment team member on a level 5 assessment team should have already been through several assessments. If not, you are at great...
David Greer
dagreerga
Offline Send Email
Sep 7, 2003
7:50 pm
2761
Hi Ravi, Just to add some more points to wht Sarika had said.... You can classify NC as Major or Minor Major: Threat of failure to perform Not meeting...
santhosh1456
Offline Send Email
Sep 7, 2003
7:50 pm
2762
Hi Priya, Well there is no specific timeframe for Maturity rating.....you can get assessed for Level-5 today and then hold the certificate for another 10yrs. ...
Santhosh Jayakumar
santhosh1456
Offline Send Email
Sep 9, 2003
12:27 pm
2763
Hi Everybody, NCs should be classified as Major or Minor based on the impact analysis. NC having higher impact would be classified as major and lower impact as...
Rajiv Deo
rajivdeo
Offline Send Email
Sep 9, 2003
12:28 pm
2764
That's interesting... Your statement seems to conflict with the intent of a CMM assessment - it infers a CMM assessment is a certification. The SEI does not...
Scott Clay
saclay
Offline Send Email
Sep 9, 2003
12:30 pm
2765
Hello, Pls. find below some detailed description of NCR classification. a. Prepare an audit checklist with details of your Process Requirements b....
Mathi Ezhil Arasu
marasu2000
Offline Send Email
Sep 10, 2003
12:17 pm
2766
Hi All, I was just wondering, when we talk about doing size estimation, are we talking about just estimating the size of the code or do we also estimate the...
Premalatha Venugopal
kanchi_v
Offline Send Email
Sep 10, 2003
12:17 pm
2767
I have been monitoring this group for several years now, and this is the first time that I have been forced to place a note. Many of you have stressed the...
davidcinnz
Offline Send Email
Sep 10, 2003
12:18 pm
2768
My take on this point- While it is good to classify findings as NCs and Observations and further classify NCs as Major/Minor/Critical etc. one has to keep in ...
sathulan
Offline Send Email
Sep 10, 2003
12:18 pm
2769
I agree with the point raised by Scott. It is always a CBA-IPI assessment and *not* a certification. 2ndly, while not mandatory, a re-assessment is recommended...
sathulan
Offline Send Email
Sep 10, 2003
12:18 pm
2770
Hi, What is typically done is estimate the size of the product, that is, the size of the source code or the function points. Size of documents are not usually...
Roy J
roy_spi
Offline Send Email
Sep 12, 2003
10:40 am
2771
... Amen to that. Sadly, the CMM seems to be going from being a genuine attempt to bring (total) quality to software development to yet another piece of...
David Covey
davidpsandqs
Offline Send Email
Sep 12, 2003
10:40 am
2772
Hi Friends, Can you please suggest or send some sort of help on KPA 'Training Program' for level 3. Thanking you in advance. Sreenu...
sreeny1971
Offline Send Email
Sep 12, 2003
10:40 am
2773
I have to second David's opinion in this regard. In fact, there is no place in the model were the granting of a certificate is even mentioned. The three...
David Greer
dagreerga
Offline Send Email
Sep 12, 2003
10:40 am
2774
The CMM gives quite a few examples of the types of artifacts to estimate the sizes of, and methods of size estimation. Please also note, that there is nowhere...
David Greer
dagreerga
Offline Send Email
Sep 12, 2003
10:40 am
2775
Hi Mike Attending such a conference can help you meetup with fellow process Group members and SPI drivers etc. You will get to hear some of their experiences...
guptabs
Offline Send Email
Sep 12, 2003
10:40 am
2776
Hi Take a look at www.projectbynet.com With process pack it can help you manage process asset library. Another tool integrating Quality and Project Management ...
guptabs
Offline Send Email
Sep 12, 2003
10:41 am
2777
Hi, This looks like going backwards. Size estimates are meant to be a proxy for effort and cost estimate. If you have an estimate of size, you can easier and...
andre.heijstek@...
andreheijstek
Offline Send Email
Sep 13, 2003
9:48 pm
2778
To:cmmi_process_improvement@...:"Mike Phillips" <dmp@...> | This is spam | Add to Address BookDate:Sun, 14 Sep 2003 07:01:27...
ramesh aralikate
ramesh_arali...
Offline Send Email
Sep 15, 2003
1:17 pm
Messages 2749 - 2778 of 3864   Oldest  |  < Older  |  Newer >  |  Newest
Advanced
Add to My Yahoo!      XML What's This?

Copyright © 2007 Yahoo! Inc. All rights reserved.
Privacy Policy - Terms of Service - Guidelines - Help